Shared Rail Readiness Board

Clock 06:12 CT

Scenario readout

Oak Grove can cover the next direct rail move while Warrior stays available for the following slot.

Both mines are green. The corridor board is acting as a confidence layer, not an alerting system.

Next movement

Rail set E247-08

Planned
06:00
ETA
06:00
Path
Mobile direct rail
Coverage
72,000 tons covered

Operational corridor schematic

Primary path vs relief path

Schematic only. This shows corridor logic and consequence, not exact rail geography.

Mine readiness

What each mine can actually cover

Corridor-ready tons, product mix, and the next operational constraint for each site.

24-hour corridor view

Shared timing and consequence map

Delay only matters when translated into stockpile pressure, grade coverage, and vessel risk.

Exception feed

What changed and who owns it

Role-aware exceptions and operating notes.